Using Automation to Close the Loop Between Functional Requirements and Their Verification
This session will define a “Verified by” relationship between the Verification Requirement and the Coverage Intent work item and the Verification Requirement and Test work item. The final pieces needed to close the loop is the proof that the coverage item was met in a passing simulation.