Authors:
- Fritz Ferstl - Univa
- Darron May - Mentor Graphics
Abstract:
Getting the very best from your verification resources requires a regression system that understands the verification process and is tightly integrated with Workload Management and Distributed Resource Management software. Both requirements depend on visibility into available software and hardware resources and by combining their strengths, users can massively improve productivity by reducing unnecessary verification cycles.
Introduction:
Your last project had your compute grid running constantly at 100 percent capacity and your simulation licenses were maxed out most of the time. The next chip is twice as large so you must have to double or treble your resources.
View & Download:
Read the entire Are You Really Confident That You Are Getting the Very Best From Your Verification Resources? technical paper.
Source:
DVCon 2014
|