VIP design

, ,

In reply to kireeti1192:

In most projects we were starting with the UVM Testbenc hat the same time the RTL design was starting, i.e. there was no RTL ready. If a company is wise it goes exactly this way, because the verification lasts in most cases longer than the RTL implementation.