In reply to chr_sue:
Inside run_phase there are four different sub phases reset, config, main and shutdown. So do we need to bother about those phases when we call reset sequence in the middle of the test? I thought we need to jump back to the reset phase inside a run phase when we call reset seq. In general if we have got reset on the interface how should or what should be the best way to handle using these phases and which phases should be used.
Thank you,
Mega