In reply to rmozhiku:
Hi,
Generally, we configure the DUT in the configuration phase sequence and send any data traffic in main phase.
Is it possible to restructure your configuration sequence so that the DUT configuration resides in configuration sequence and the other thing which runs in forever and should be there till end of test?
This way you will be able to synchronize DUT configuration through configure phase and forever can be called from rum phase.
Regards,
Yogesh