In reply to paru0885:
Yes, but that’s what I meant by having different clock rates. Adding a specific task that takes 6ms is the same as adding a clock with a 6ms period. A larger ratio between the periods means it takes more smaller clock periods of activity to reach one larger period. The absolute time scales do not matter for performance, only the ratios.