# Overriding the time consuming phases in UVM by calling super method

**URL:** <https://verificationacademy.com/forums/t/overriding-the-time-consuming-phases-in-uvm-by-calling-super-method/41034>\
**Category:** UVM\
**Tags:** run\_phase, UVM\
**Created:** [November 23, 2022, 1:18pm UTC](https://verificationacademy.com/forums/t/overriding-the-time-consuming-phases-in-uvm-by-calling-super-method/41034 "2022-11-23T13:18:04Z")\
**Posts on this page:** 2\
**Page:** 1

<div class="post-metadata">

**Author:** ![MunsifM.Ahamd](https://verificationacademy.com/forums/letter_avatar_proxy/v4/letter/m/87869e/32.png) [@MunsifM.Ahamd](https://verificationacademy.com/forums/u/MunsifM.Ahamd)\
**Post date:** [November 23, 2022, 1:18pm UTC](https://verificationacademy.com/forums/t/overriding-the-time-consuming-phases-in-uvm-by-calling-super-method/41034/1 "2022-11-23T13:18:04Z")

</div>

Why it is not mandatory to override the time consuming phases(task based phases) by calling super method, for instance in run\_phase, super.run\_phase(uvm\_phase); , but as it is mandatory to override the function based phases by calling super method.

---

<div class="post-metadata">

**Author:** ![dave\_59](https://verificationacademy.com/forums/user_avatar/verificationacademy.com/dave_59/32/4499_2.png) [@dave\_59](https://verificationacademy.com/forums/u/dave_59)\
**Post date:** [November 24, 2022, 2:06pm UTC](https://verificationacademy.com/forums/t/overriding-the-time-consuming-phases-in-uvm-by-calling-super-method/41034/2 "2022-11-24T14:06:33Z")

</div>

_In reply to [Munsif M.Ahamd](https://verificationacademy.com/forums/t/overriding-the-time-consuming-phases-in-uvm-by-calling-super-method/41034):_

It is never mandatory to call super. on any phase. As far as I know non of the uvm\_component phases have anything in them except the build\_phase. That is only needed if you use the field automation macros, which we do not recommend.
